Testing & Commissioning

Pre-Commissioning Inspection

A physical check of the installation before anything is energised, because problems are cheaper to find now.

Pre-commissioning inspection is the last opportunity to find an installation problem while the equipment is still safely de-energised. Everything after this point is testing with the primary circuit live or partially live.

It is a systematic physical check rather than a walk-past, and it produces a record of what was found and what was corrected.

What the inspection covers

  • Termination condition and tightness
  • Earthing and bonding continuity
  • Mechanical mounting and structural fixing
  • Cable condition, support and gland integrity
  • Phase identification and labelling
  • Enclosure sealing and IP integrity
  • Clearances to conductors, ground and structures

What matters in practice

  • Cheapest point to find a fault

    A loose termination found during inspection costs minutes. The same termination found after energising costs an outage, and possibly equipment.

  • Labelling is a safety issue

    The next person to work on this installation relies on the labelling being correct. Incorrect phase identification is a hazard, not an inconvenience.

  • Sealing before the first rain

    IP integrity is checked before handover, because water ingress into a control cabinet is discovered at the worst possible moment otherwise.

  • Recorded findings

    What was inspected, what was found and what was corrected goes into the commissioning record.